House Reno Project Update

Length: 27:44
Rating: 5 / 5 (out of 2 votes)

Garage area partition wall is up and the drywall installation and insulation on the walls is finished. We just have to mud the joints and sand out. You can see Malcolm and I framing in the laundry room and bathroom now at the rear of the garage area. There is a door off the kitchen that will lead into the laundry room and another door for the bathroom. Also we are installing the heating ducts that will supply the warm air to both of these rooms. The video was sped up 400% so we are moving and lightening speed.

Tags: home house drywall taping mud bathroom framing reno room project update laundry garage vapor barrier heating ducts

Plastering / Taping Drywall Joints PART 3 - Sanding and filling gaps with acryl

Plastering / Taping Drywall Joints PART 3 - Sanding and filling gaps with acryl

Posted on Tuesday, 10th of August 2010
Length: 07:48
Rating: 0 / 5 (out of 0 votes)
Views: 4

Plastering / Taping Drywall Joints PART 2 - Plastering

Plastering / Taping Drywall Joints PART 2 - Plastering

Posted on Monday, 09th of August 2010
Length: 00:00
Rating: 0 / 5 (out of 0 votes)
Views: 3

Plastering Taping Drywall Joints PART 1 Introduction

Plastering Taping Drywall Joints PART 1 Introduction

Posted on Monday, 09th of August 2010
Length: 06:04
Rating: 0 / 5 (out of 0 votes)
Views: 13

Robert Hardin Drywall - Drywall Contractor in San Bernardino

Robert Hardin Drywall - Drywall Contractor in San Bernardino

Posted on Monday, 25th of January 2010
Length: 00:21
Rating: 0 / 5 (out of 0 votes)
Views: 17